Restoration Projects

Project Year Restoration Project Detail
2022
  • Fire detection system purchased and installed
  • Orpheum First Street Mural Project
2021
  • Boiler system replaced
  • Sound and light desk upgraded and installed
2020
  • First Street doors replicated and replaced
2019
  • Balcony aisle lighting upgraded
  • Exterior canopy roof repaired and upgraded
  • Significant IT system upgrades for enhanced cyber security
2018
  • Boiler room vault restoration
  • Mezzanine concession expansion
  • New emergency back-up lighting system purchased & installed
2017
  • New A/C chiller system installed
  • New fire escape designed, constructed and installed
2016
  • Marquee message board upgraded
  • New digital film projection system installed
2015
  • Rear lobby and east stairwell fully restored
2013
  • Exterior lights added on the stage house, video surveillance security system installed
2012
  • Projection booth restored with heating, ventilation, and air conditioning
2011
  • Exit improvements and dressing room doors replaced
  • Fire alarms installed throughout the building
2010
  • Stage lighting and controls replaced
2009
  • Brick and tuckpointing on the east and west side exterior of the theatre were replaced.
  • New roofing system installed on the south side of the stage house.
  • Handicap restroom was installed on first floor.
2008
  • Historic light fixtures replicated and installed on mezzanine level
2007
  • First floor concession lobby fully restored
2006
  • Box office lobby and vestibule fully restored
2004
  • Stage vent house restored with new side walls
2003
  • Wood doors and windows restored with new glazing on 1st street
2002
  • Men’s restroom fully restored, women’s restroom expanded and restored
  • Brick and tuckpointing on north stage house exterior replaced
  • Stage load-in doors replaced and new exit door added
2001
  • New Marquee and message board installed with electric power
  • Mezzanine restroom improvements with new electricity, heat, and air conditioning
  • Exit lights installed with new lighting and battery unit
  • Roof over concession lobby and mezzanine corridor replaced
1998
  • Boiler, pumps, fan, and roof air conditioning chiller replaced.
  • New electrical wiring installed
1996
  • Theatre and stage roof replaced with new roof gutters and drain leaders

 