2022 |
- Fire detection system purchased and installed
- Orpheum First Street Mural Project
|
2021 |
- Boiler system replaced
- Sound and light desk upgraded and installed
|
2020 |
- First Street doors replicated and replaced
|
2019 |
- Balcony aisle lighting upgraded
- Exterior canopy roof repaired and upgraded
- Significant IT system upgrades for enhanced cyber security
|
2018 |
- Boiler room vault restoration
- Mezzanine concession expansion
- New emergency back-up lighting system purchased & installed
|
2017 |
- New A/C chiller system installed
- New fire escape designed, constructed and installed
|
2016 |
- Marquee message board upgraded
- New digital film projection system installed
|
2015 |
- Rear lobby and east stairwell fully restored
|
2013 |
- Exterior lights added on the stage house, video surveillance security system installed
|
2012 |
- Projection booth restored with heating, ventilation, and air conditioning
|
2011 |
- Exit improvements and dressing room doors replaced
- Fire alarms installed throughout the building
|
2010 |
- Stage lighting and controls replaced
|
2009 |
- Brick and tuckpointing on the east and west side exterior of the theatre were replaced.
- New roofing system installed on the south side of the stage house.
- Handicap restroom was installed on first floor.
|
2008 |
- Historic light fixtures replicated and installed on mezzanine level
|
2007 |
- First floor concession lobby fully restored
|
2006 |
- Box office lobby and vestibule fully restored
|
2004 |
- Stage vent house restored with new side walls
|
2003 |
- Wood doors and windows restored with new glazing on 1st street
|
2002 |
- Men’s restroom fully restored, women’s restroom expanded and restored
- Brick and tuckpointing on north stage house exterior replaced
- Stage load-in doors replaced and new exit door added
|
2001 |
- New Marquee and message board installed with electric power
- Mezzanine restroom improvements with new electricity, heat, and air conditioning
- Exit lights installed with new lighting and battery unit
- Roof over concession lobby and mezzanine corridor replaced
|
1998 |
- Boiler, pumps, fan, and roof air conditioning chiller replaced.
- New electrical wiring installed
|
1996 |
- Theatre and stage roof replaced with new roof gutters and drain leaders
|